Covenant School

Smithville, Ontario, 1993

School addition - radiant floor heating

 

front_of_school.jpg (16767 bytes)
Front of school.

kindergarten_floor_roughin.jpg (41740 bytes)
Kindergarten room floor roughin.

kindergarten_flinished.jpg (30704 bytes)
Kindergarten room -finished.

gym_floor_roughin.jpg (32336 bytes)
Gym floor roughin.

gym_finished.jpg (19597 bytes)
Gym floor - finished.

mech_room.jpg (27294 bytes)
Viessmann low temperature hot water boiler.

 


Copyright © 2004
Beninger Engineering Limited

brian@beninger.ca