A Village Post And Beam Home

 
 
  Basement  

Click for large photo ...

Click for large photo ...

Click for large photo ...

Initial excavation. 

 

Due to poor soil conditions a step footing was required on the east side of the excavation. New 20" wide by 10" deep footings ready for walls.

     
Click for large photo ... Click for large photo ... Click for large photo ...
A knee wall was required on the east side due to poor soil conditions. Footings and pads for jack posts. Drainage and gravel in place.

     

Click for large photo ...

  

Click for large photo ...

Basement wall forms up and poured.   Sono-tubes in place for porch support.

     

Click for large photo ...

Click for large photo ...

Click for large photo ...

Completed basement walls with some initial framing. Sono-tubes for porch. Rear of basement featuring walk-out and windows.
     
     
 
 