Wall
Installation |
|
|

|

|
 |
|
Drywall and a vapour
barrier are put in place before the wall is hoisted into position. |
Tyvek is folded into place
covering the rim joist.. |
A wing wall sails into
place.
|
|
|
 |
|
|
|
Drywall begins on
great room. |
|
Front wall panels are all
in place.
|
|
 |
|
|
|
Great room panel goes in. |
|
Great room wall panels
going into place.
|
|
 |
|
|
|
Great room wall panels
going into place. Window opening is cut to facilitate wall panel
installtion. |
Dining room wall panels
going into place. All of the wall panels are
placed and spiked into the posts. |
Wall containing rough
opening for the Paladium window is suspended ready for locating.
|
|
 |
 |
|
|
Rear of building wall
installation complete. |
Rear of building with
Bonneville windows installed. |
Rear of building with
casement windows. Windows were open to reduce the moisture in the
building.
|
|
 |
 |
|
|
Pine planking for visible
pine ceilings installed. |
Pine
planking complete and vapour barrier installed. |
Porch
construction commences.
|
|
 |
 |
|
|
OSB installed over solid
foam insulation in roof.. |
OSB
installed over solid foam insulation in roof. |
Porch construction well
underway.
|
|
 |
 |
|
|
Almost ready forshingles. |
Ready for
shingles. Dormers are done. |
Roofing
underway and porch almost complete.
|
|
 |
 |
|
|
Roofing complete. |
Roofing complete. |
The
building essentially all closed in.
|
|
|
|
 |
|
|
|
The
building essentially all closed in. |
|
|
|