A Village Post And Beam Home

 
 

Wall Installation


Click for larger photo ...

Click for larger photo ...

Click for larger photo ...

 Drywall and a vapour barrier are put in place before the wall is hoisted into position. Tyvek is folded into place covering the rim joist.. A wing wall sails into place.

Click for larger photo ...

 

Click for larger photo ...
 Drywall begins on great room.

 

Front wall panels are all in place.

Click for larger photo ...   Click for larger photo ...
Great room panel goes in.  

Great room wall panels going into place.


Click for larger photo ... Click for larger photo ... Click for larger photo ...

Great room wall panels going into place.  Window opening is cut to facilitate wall panel installtion.

Dining room wall panels going into place. All of the wall panels are placed and spiked into the posts.

Wall containing rough opening for the Paladium window is suspended ready for locating.

Click for larger photo ... Click for larger photo ... Click for larger photo ...
Rear of building wall installation complete.

Rear of building with Bonneville windows installed.

Rear of building with casement windows. Windows were open to reduce the moisture in the building.


Click for larger photo ... Click for larger photo ... Click for larger photo ...
Pine planking for visible pine ceilings installed.

Pine planking complete and vapour barrier installed.

Porch construction commences.


Click for larger photo ... Click for larger photo ... Click for larger photo ...
OSB installed over solid foam insulation in roof..

OSB installed over solid foam insulation in roof. 

Porch construction well underway.


Click for larger photo ... Click for larger photo ... Click for larger photo ...
Almost ready forshingles.

Ready for shingles.  Dormers are done.

Roofing underway and porch almost complete.


Click for larger photo ... Click for larger photo ... Click for larger photo ...
Roofing complete. Roofing complete.

The building essentially all closed in.


Click for larger photo ...
 

The building essentially all closed in.

 

 

Basement Framing Exterior Walls Interior FAQ Floorplan Mail

Last update: Saturday Jun 28, 2008. You are visitor: since August 17th, 1999. All original photography Copyright © 1999-2008 Village Post and Beam. All Rights Reserved. Text and photos may not be copied in whole or in part without permission.